List or condition check
List or condition check
Procurement begins from a BOQ or materials schedule. Maintenance begins from handover records or a condition visit.

Our services
Jortin Limited sources construction materials and PPE on a reliable basis, and we can stay with you after handover. Planned maintenance protects the investment and keeps buildings, roads and water systems performing as they were intended to.
We source construction materials and certified PPE to your specification, and we can stay on after handover to snag defects and maintain the asset. Appoint either offer on its own, or as follow-on care after work we have built, across Nairobi and its environs.
Materials bought cheap and fitted badly cost more than materials bought right. We source to the specification, inspect what arrives, and keep the delivery records that a maintenance team will need later.
A maintenance arrangement is most useful when the contractor already knows the asset. We take maintenance contracts on systems we have been able to inspect, and we will tell you honestly when a repair is maintenance and when it is construction.
Substitution requests are never silent. If a specified item is unavailable, you see the alternative, the standard it meets, and the price difference before it is bought.
Scope
Construction materials procured against a specification or an agreed schedule, not against a vague request for standard goods.
Inspection on delivery, so quantities and obvious defects are checked before materials are built in.
Certified PPE and site safety gear for Jortin sites and, where agreed, for a client's own teams.
Post-construction snagging and defect-liability care for work we have delivered, during the period agreed in the contract.
Planned preventive maintenance visits for buildings, water systems and road or drainage assets, on a written schedule.
Responsive call-outs for agreed items, with a clear note of what is included in a visit and what is a separate repair.
Working with us
Procurement and maintenance start from a list you can audit: BOQ, specification or condition report. We source to that list, check deliveries, and keep simple records your site team or accountant can use.
Procurement begins from a BOQ or materials schedule. Maintenance begins from handover records or a condition visit.
You see items, exclusions and realistic lead times before an order is placed.
Materials and PPE meet the specification on delivery. Maintenance visits are scheduled with agreed access.
Goods arrive where the site needs them. Maintenance findings are written up, with photos where useful.
Delivery notes or service sheets are handed over for your file and for the next contractor.
FAQ
Yes. We need a specification or a detailed list, a delivery location, and an agreed standard for substitutions if a specified item is unavailable.
We can, after a visit. The contract should list the assets, the visit frequency, what is included, and how repairs are authorised.
If it is within the agreed defect-liability period and within our scope, we will attend and put it right. If it is outside that period or outside our scope, we will still tell you what we see and how it can be handled.
Often yes, if we can inspect it, obtain the available yield and equipment data, and agree a fair scope. If the data is missing, the first visit becomes an investigation.
If you need materials, PPE, snagging or a maintenance plan for a building, road or water system in Kenya, send the list or the site details. We will come back with a written, limited scope.